View of the layout plan of Tanjong Pagar Container Terminal of Port of Singapore Authority at East Lagoon. It was a modern terminal equipped with sophisticated container handling facilities for fully cellular container vessels. The plan shows the location of Victoria Dock (completed in 1868), Albert Dock (completed in 1879) and Keppel Shipyard along Sheer's Wharf; Berths 44 and 45 along East Wharf; Berths 46 and 47, Cross Berth (48) and Main Berths (49-51) along East Lagoon; Feeder Berth (52); Main Berths (53 and 54); Berth 55 (under-construction); PSA Gate 2 at Keppel Road; PSA Gate 3 and Container Terminal Building at Rambau Street; PSA Gate 4 at Trafalgar Street; Finger Pier of Telok Ayer Basin; Container Chassis Holding Area; Mechanical Engineering Shed, Scotts Green Container Yard, Central Workshop, container yards, and freight stations.